Sidewalk Construction/Work

Area:       Sidewalk West Side of Dieke Bldg from Steam Alley to Dieke Entrance
            
Start Date: May 17, 2023
End Date:   July 6, 2023
Parking is Not Applicable
No Additional Comments

Posted By:
Daniel Scott  CSR (dws236@psu.edu)

Sidewalk Construction/Work

Area:       UP Campus
            Contractor will begin raising 24 steam manholes to prevent water infiltration. these manholes are scattered across the campus. contractor will begin on Hastings rd near the land and Water building and work west from there
Start Date: March 22, 2023
End Date:   August 4, 2023
Times:      From 7:00 am to 5:00 pm each day.
Parking is Not Applicable
No Additional Comments

Posted By:
Kevin Roach - Utilities Planner/Estimator (dkr5449@psu.edu)

Parking Spots closing

Area:       Brown A between Deike and EE West
            a dozen parking spots along the northeast side of Brown A along EE West will be blocked off to allow contractor access and laydown for work down in the EE West courtyard area over the summer of 2023.  
Start Date: April 24, 2023
End Date:   August 11, 2023
Times:      From 6:00 am on 4/24 to 5:00pm on 8/11.
Parking is Blocked
No Additional Comments

Posted By:
Jeff Kokoskie/Manager, Construction Services (jlk29@psu.edu)

Intermittent roadway disruptions

Area:       Curtin Rd
            Pattee/Paterno Curtin Rd Entry 
Start Date: May 8, 2023
End Date:   August 11, 2023
Parking is Not Applicable
No Additional Comments

Posted By:
Project Manager  (dsl5056@psu.edu)

Parking

Area:       Red K
            Red K Parking lot will be offline. No parking or through pedestrian or vehicle access from College Ave or Steam Dr 
Start Date: May 8, 2023
End Date:   August 11, 2023
Parking is Blocked
Additional Comments:

Red K parking blocked.

Posted By:
Mike Brown (msb35@psu.edu)

Possible Reduced Lanes and Sidewalk Closures

Area:       Porter Rd, Curtin Rd, Bigler Rd, Pollock Rd, Shortlidge Rd, College Ave
            Replacing/Installing New Street lights. Watch for possible temporary reduced lanes and sidewalks. Follow all construction signage.


Start Date: May 8, 2023
End Date:   August 11, 2023
Parking is Not Applicable
No Additional Comments

Posted By:
Mike Brown CSR (msb35@psu.edu)

Parking lot restriction

Area:       Brown A west side of lot between Dieke and EE West.
            
Start Date: May 19, 2023
End Date:   August 11, 2023
Parking is Not Applicable
No Additional Comments

Posted By:
Daniel Scott  CSR (dwscott50@psu.edu)

Sidewalk Construction/Work

Area:       Willard Building South Entrance and Sidewalks
            South Entrance to Willard will be closed. Will be available for emergency egress only. ADA will use West entrance to Willard. Sidewalks in immediate area will be closed. Please follow all construction signage.
Start Date: May 30, 2023
End Date:   August 11, 2023
Parking is Blocked
Additional Comments:
Three Parking Spots in Brown A South East Corner will be blocked for project.

Posted By:
Mike Brown CSR (msb35@psu.edu)

Sidewalk Construction/Work

Area:       Sidewalk from Sackett to Pattee Library (west side of mall)
            Sidewalk closure and partial closures for steam tunnel hatch replacements. Sidewalk located in front of Sackett Building (on mall) to Pattee library. Sidewalk will be closed in phases with access to buildings being maintained. Sidewalk in from Pollock Road to Sackett will be opened by July 7th. Sidewalk closure signs will be in place to alert and direct pedestrians. ADA accesses are maintained. 
Start Date: May 8, 2023
End Date:   August 17, 2023
Parking is Not Applicable
No Additional Comments

Posted By:
Morgan VanOuse/Project Manager (mbt127@psu.edu)

Parking Stall Closure

Area:       Service Stalls by Sparks Building
            Four Service Stalls by Sparks Building (north end) will be closed for laydown area for the Steam Tunnel Hatch Replacements starting July 10th through August 17th. 
Start Date: July 10, 2023
End Date:   August 17, 2023
Parking is Not Applicable
No Additional Comments

Posted By:
Morgan VanOuse/Project Manager (mbt127@psu.edu)

Reduced Lanes

Area:       Entrance and Parking lot south of Wagner and west of shields
            
Start Date: May 10, 2023
End Date:   September 28, 2023
Parking is Not Applicable
No Additional Comments

Posted By:
Daniel Scott  CSR (dws236@psu.edu)

Sidewalk Construction/Work

Area:       North Sidewalk of Pollock Road
            Sidewalks on north side of pollock road will be partially closed for Steam Tunnel M/O/P abatement and repairs from Willard Building to Boucke Building. Fencing will be set up around hatches for materials/ventilation/equipment. 
Start Date: May 8, 2023
End Date:   September 29, 2023
Parking is Not Applicable
No Additional Comments

Posted By:
Morgan VanOuse/Project Manager (mbt127@psu.edu)

Reduced Lanes

Area:       Fischer Road
            The center lane of Fischer road will be used for Westward traffic in front of Moore Building.  
Start Date: August 4, 2022
End Date:   September 30, 2024
Parking is Not Applicable
Additional Comments:
Two way traffic will not be impacted

Posted By:
Chad illig/Construction Service Representative (cri103@psu.edu)

Reduced Lanes

Area:       Pollock Road (Henderson Mall)
            Work on Pollock Road, between the access gates, will be taking place starting the week of 5/31. The North lane of Pollock, between the gates, will be closed and remain closed for the duration of the project. Select,two-way traffic access through gate on South lane of Pollock only. Yield to oncoming traffic in this area.

Various sidewalks near Osmond, Davey, Whitmore, South Frear, Buckhout and Bouke labs will be closed and detoured due to utility-related work in the vicinity.
Please follow all vehicle/pedestrian/bike detours and signage.
Start Date: May 9, 2022
End Date:   December 31, 2024
Parking is Blocked
Additional Comments:
Brown Lot C (Behind Osmond Lab)
The Brown C parking lot, behind Osmond Lab will be closed, with access to the Brown B parking lot and Brown C (Ritenour) remaining available through a detoured route.

Posted By:
Mike Brown CSR (msb35@psu.edu)

Permanent Road Closing

Area:    Shortlidge Road from Pollock to Eisenhower Auditorium

Shortlidge Road from Pollock to Eisenhower Auditorium is permanently closed.  Access to Ritenour Parking lot is now via a new road from Osmond Lab traveling between Boucke and the Telecom Building.

Permanent Parking Lot Closing

Area:    Lot Red H 

Lot Red H - west side of Rec Hall south gym, accessed from Atherton street will be permanently closed on 04-01-2005.  The lot is the site of the new Rec Hall Wrestling and Student Fitness Center.  Parking spaces have been relocated at the west and south sides of Noll Lab, accessed from Burrows Rd.

To subscribe yourself to the Road Closing mailing list, send mail to listserv@lists.psu.edu with subscribe RoadC-L in the body of the email
To unsubscribe yourself from the Road Closing mailing list, send mail to listserv@lists.psu.edu with unsubscribe RoadC-L in the body of the email

To subscribe yourself to the ElmTree Spraying mailing list, send mail to listserv@lists.psu.edu with subscribe Elmtree-L in the body of the email
To unsubscribe yourself from the ElmTree Spraying mailing list, send mail to listserv@lists.psu.edu with unsubscribe Elmtree-L in the body of the email